Skip to content

Hornby R40028 BR Dept ex-Mk1 FO Brk Frc Rnnr

by Hornby
SKU HORR40028
Original price $93.95 - Original price $93.95
Original price
$93.95
$93.95 - $93.95
Current price $93.95
Product Inventory
loading..

Hornby R40028 BR Dept ex-Mk1 FO Brk Frc Rnnr

The first standardised railway carriage design built by British Railways, the Mark 1 coach introduced in 1951 could be found across Britain's railway network and continued to be produced until 1963, and even later in the form of multiple units and non-passenger stock. Along with being widely deployed, Mk1 coaches were built in various places including Derby, Doncaster, Eastleigh, Swindon, Wolverton and York. Most Mk1 coaches had 63ft 5in long underframes with 64ft 6in long bodies, although some were built shorter to be used on tighter curves where large overhangs would otherwise have prohibited running. In 1977 a reduction in the number of fatalities on British railways since 1955 was attributed to the introduction of the Mk1 coaches due to their steel build, strong underframe, and buckeye couplings making them far safer in the event of an accident. Mk1 coaches started to be withdrawn from widescale service in the 1990s, although in some regions, particularly in the south, Mk1 base multiple units continued to be used well into the 2000s. Network rail continue to use modified Mk1 coaches for various departmental duties and rail tour operators continue to use Mk1 coaches on specially organised services. Delivered in 1959, BR coach number 3091 was converted to an MTA Brake Force Runner in 1986.

Tech Specs

Item Length - Without Packaging (cm)
26.5
Item Scale
1:76 Scale 00 Gauge
Finish
Painted
Colour
Green
Gauge
OO
Operator
BR
Designer
BR
Livery
BR Olive
Minimum Curve (mm)
Radius 2